This project is designed for the entire Changshu municipality. It has a relatively large amount of engineering and involves 12 townships. It has an important role in the entire Changshu water system. Because the span is relatively large, the whole difficulty is still relatively large, and the company is facing difficulties. In the above, using high professional knowledge and R & D team, according to the entire project requirements and effects to make a specific design layout, the entire project uses a total of 142 sets of integrated pump stations, the specific parameters are as follows:
Num |
Diameter(mm) |
Height(mm) |
Num |
1 |
1200 |
2000 |
1 |
2 |
1200 |
2500 |
17 |
3 |
1200 |
3000 |
31 |
4 |
1200 |
3500 |
45 |
5 |
1200 |
4000 |
13 |
6 |
1200 |
4500 |
6 |
7 |
1200 |
5000 |
3 |
8 |
1200 |
5500 |
1 |
9 |
1200 |
6000 |
1 |
10 |
1500 |
3500 |
1 |
11 |
1500 |
4000 |
1 |
12 |
1500 |
4500 |
1 |
13 |
1500 |
5000 |
1 |
14 |
1500 |
5500 |
1 |
15 |
1500 |
6000 |
1 |
16 |
1500 |
6500 |
3 |
17 |
2000 |
4000 |
1 |
18 |
2000 |
4500 |
1 |
19 |
2000 |
5000 |
1 |
20 |
2000 |
5500 |
1 |
21 |
2000 |
6000 |
1 |
22 |
2000 |
6500 |
2 |
23 |
2000 |
7000 |
2 |
24 |
2500 |
5500 |
1 |
25 |
2500 |
6000 |
1 |
26 |
2500 |
6500 |
1 |
27 |
2500 |
7000 |
1 |
28 |
2500 |
7500 |
2 |
二、Integrated pumping station pump |
|||
1 |
0.75kw |
One use |
266 |
2 |
1.5kw |
One use |
10 |
3 |
4.0kw |
One use |
6 |
4 |
7.5kw |
One use |
2 |
The company is an integrated pumping station manufacturer. The sewage pumping stations, pipes and valves in the integrated pumping station used in this project are all integrated equipments. The structure is compact and does not occupy the place. It can meet the 24-hour unattended operation. With automatic control, fault SMS reminder and remote monitoring.
The company has been adhering to the "all-round, high-quality, fast service" standards, aiming at customer satisfaction, custom design according to customer requirements, to make an integrated pump station that meets customer requirements, product delivery within one week, our company's after-sales The personnel will track the effect and promise that the product can be complained of any quality problems. We will reply within 2 hours, rush to the site within 4 hours to deal with it, and repair and replace the fault within 20 hours. Let customers have no worries.
Consulting the advanced new technologies and products of sewage treatment industry:4007800879